a variance envelope has been established on a project. the envelope goes from +-30% in r&d to +-5% during manufacturing. the reason for the change in thickness of the envelope is because:

A、the management reserve has been used up.

B、the accuracy of the estimates in manufacturing are worse than the estimates in r &

C、tighter controls are always needed as a project begins to wind down.

D、of the personal desires of the project sponsor.

E、of none of the above